How Much Does it Cost to Build a New Home in Dixon?

$13.1K Cheap
$53.5K Great Price
$109.4K Costly
View Full Cost Chart

There are two ways that Dixon new home builders earn out of housing projects; the bidding method and the cost plus method. Most new home builders generally use the bidding method. With this approach, a builder will get quotations from his subcontractors or just use his judgment to arrive at a reasonable cost for the project. Typically, the price will include the plumbing, floorings, electrics, fees and much more. Afterwards, they will add their profit together with a contingency fee that is usually 10% of the overall cost. Contingency fees are included in case the project gets over budgeted. The total cost will be presented to the homeowner.

Can a reliable Dixon home builder help in finding an excellent location and lot for our house?

Yes. Most new home builders can help you determine the best lot for your new house. They will take into consideration all your requirement to find a lot that will suit your needs. There are home builders who offer lots to their clients at marked up but reasonable prices.

How long will a new home building in Dixon last?

Every home building is different. Therefore, they have different project durations and costs. The duration will always depend on the design of the house, the materials to be used, the location, and the size of the house.

Do Dixon new home builders offer warranty for their buildings?

Yes. Most home builders offer 6 months up to 1 year of warranty from the date of turnover to ensure that all concerns of the customer will be covered for the first few months of their stay in the house.

Find the Best Costs on New Home Builders - Dixon, 95620

The cost plus method is subdivided into two categories: the cost-plus-percentage and the cost-plus-fixed-rate. In a cost-plus-percentage setup, the homebuilder will get estimates for the subcontractor fees and the price of materials, appliances, furniture, and other things that will be included in the construction of the house. They will give allowance to each material that will be purchased and will mark up all of it by a set percentage. The cost-plus-fixed-rate, on the other hand, is the most preferable method. This approach allows a homeowner and new home builders to agree on a fixed rate that the builder will be paid upon. To determine the new home builder’s fee, the cost of the house, the size difficulty of the project and the location should all be taken into consideration. The builder will compute the overall total cost of the project then set a certain percentage to arrive to their fee. Always choose a trustworthy and decent new home builder. By doing so, you will be assured that your housing finances will be clean and comfortable.

Local pros & Availability

Custom Home Building Contractors available in your area

  • Open
  • Closed
  • 1

    NORTHERN CALIFORNIA HOME BUILDERS - NOLAN PERRY OW

    Rating: 61
    6460 FRY RD. 
    DixonCA  95620
  • 2

    KBI NORCAL WINDOWS

    Rating: 58
    1100 BUSINESS PARK DR. 
    DixonCA  95620
  • 3

    TD Construction

    Rating: 69
    210 S. Jackson St.. 
    DixonCA  95620
  • 4

    PRO FRAMERS INC

    Rating: 58
    1150 BUSINESS PARK DR. 
    DixonCA  95620
  • 5

    PAUL HEMMER CONSTRUCTION

    Rating: 57
    145 1/2 PEGORD AVE. 
    DixonCA  95620
  • 6

    F & F DESIGN BUILD CONTRACTORS

    Rating: 57
    8356 MIDWAY RD. 
    DixonCA  95620