How Much Does it Cost to Build a New Home in Fountain Valley?

$14.5K Cheap
$59.0K Great Price
$120.6K Costly
View Full Cost Chart

There are two ways that Fountain Valley new home builders earn out of housing projects; the bidding method and the cost plus method. Most new home builders generally use the bidding method. With this approach, a builder will get quotations from his subcontractors or just use his judgment to arrive at a reasonable cost for the project. Typically, the price will include the plumbing, floorings, electrics, fees and much more. Afterwards, they will add their profit together with a contingency fee that is usually 10% of the overall cost. Contingency fees are included in case the project gets over budgeted. The total cost will be presented to the homeowner.

Can a reliable Fountain Valley home builder help in finding an excellent location and lot for our house?

Yes. Most new home builders can help you determine the best lot for your new house. They will take into consideration all your requirement to find a lot that will suit your needs. There are home builders who offer lots to their clients at marked up but reasonable prices.

How long will a new home building in Fountain Valley last?

Every home building is different. Therefore, they have different project durations and costs. The duration will always depend on the design of the house, the materials to be used, the location, and the size of the house.

Do Fountain Valley new home builders offer warranty for their buildings?

Yes. Most home builders offer 6 months up to 1 year of warranty from the date of turnover to ensure that all concerns of the customer will be covered for the first few months of their stay in the house.

Find the Best Costs on New Home Builders - Fountain Valley, 92708

The cost plus method is subdivided into two categories: the cost-plus-percentage and the cost-plus-fixed-rate. In a cost-plus-percentage setup, the homebuilder will get estimates for the subcontractor fees and the price of materials, appliances, furniture, and other things that will be included in the construction of the house. They will give allowance to each material that will be purchased and will mark up all of it by a set percentage. The cost-plus-fixed-rate, on the other hand, is the most preferable method. This approach allows a homeowner and new home builders to agree on a fixed rate that the builder will be paid upon. To determine the new home builder’s fee, the cost of the house, the size difficulty of the project and the location should all be taken into consideration. The builder will compute the overall total cost of the project then set a certain percentage to arrive to their fee. Always choose a trustworthy and decent new home builder. By doing so, you will be assured that your housing finances will be clean and comfortable.

Local pros & Availability

Custom Home Building Contractors available in your area

  • Open
  • Closed
  • 1

    C S GOOD BUILDERS

    Rating: 59
    17952 ELM ST. 
    Fountain ValleyCA  92708
  • 2

    Sonny Pham

    Rating: 62
    16107 White Cap Cir. 
    Fountain ValleyCA  92708
  • 3

    S M Construction

    Rating: 66
    10316 La Hacienda Ave. 
    Fountain ValleyCA  92708
  • 4

    MORNING STAR CONSTRUCTION

    Rating: 63
    17530 SANTA DOMINGO CIR. 
    Fountain ValleyCA  92708
  • 5

    J F SHEA CONSTRUCTION

    Rating: 57
    10500 ELLIS AVE. 
    Fountain ValleyCA  92708
  • 6

    Andy Quiocho Concrete

    Rating: 91
    8884 Thames River Ave. 
    Fountain ValleyCA  92708