How Much Does it Cost to Plaster a Pool in Berkeley?

$749 Cheap
$804 Great Price
$859 Costly
View Full Cost Chart

Pool plastering Berkeley cost is determined by the size of your pool, what material and finishes to be used, preparation and labor needed. Preparing a pool for plastering may require under cutting and chipping the existing tiles of a pool if there is any. Then after that, cleaning the entire pool. This preparation typically cost between $1200 and $1600 for a 16’x32’ size pool or an average size pool. The most affordable gunite pool finish is white plaster. This is commonly composed of white Portland cement and crushed marbles. It can cost around $5000 to $7000 depending on the size of the pool and if there are repairs needed before plastering.

Estimated final cost for pool plastering

Item Quantity Fair Price
Pool Labor 8.2 Hours $590.11
Pool Job Materials and Supplies 200 Square Feet $214.57
Totals - Cost to Replaster Pools - 215 Square Feet $804.68
Average Cost Per Square Foot $4.02

How long does a pool plastering Berkeley take?

Typically, it will depend on the size of your pool and the preparation plus if there are repairs that have to be made before plastering. Under normal circumstance, pool plastering can take about 2 to 3 weeks to be finished.

What does start-up mean in Berkeley?

Start-up is deemed to be a very crucial process needed on all newly plastered pools. New plasters tend to emit dust particles that have to be brushed and vacuumed daily. Usually, it takes 4 to 6 consecutive days. If not done, the dust will stick to the surface and will stain the plaster. The start-up also requires a proper balance of pool water chemistry. A start-up should be done by professionals.

Is there any warranty for a pool plastering Berkeley service?

Yes. Pool plastering is also guaranteed by companies who do them. Residential pools normally have 10 years of warranty.

Find the Best Costs on Pool Plastering - Berkeley, 94702

If you are planning to apply finishes to your pool plastering Berkeley to make it even more appealing, you can choose between the two most common which are diamond brite and river roc. Diamond brite finish is made up of quartz infused colored mix. Pool plastering Berkeley using diamond brite finish may cost high because of the labor and time needed plus the material. It usually cost $6000 up to $9000. Berkeley pool plastering using river roc finish is the most expensive, not just in material but in labor too. Of all the pool finishes, river roc is considered to be the strongest and long lasting of all. River roc generally cost around $8000 up to $10000 depending on the size of the pool.

Local pros & Availability

Pool Contractors available in your area

  • Open
  • Closed
  • 1

    Harry K Lim & Assoc

    Rating: 58
    2972 Adeline St. 
    BerkeleyCA  94703
  • 2

    Before & After

    Rating: 58
    607 Hearst Ave. 
    BerkeleyCA  94710
  • 3

    V I P Construction

    Rating: 86
    P O Box 664. 
    BerkeleyCA  94704
  • 4

    Columbia Mechanical Contractor

    Rating: 93
    969 Folsom St. 
    San FranciscoCA  94101
  • 5

    Lewis Pools

    Rating: 79
    3049 Adeline St. 
    BerkeleyCA  94703
  • 6

    John L Staton Windows & Doors

    Rating: 77
    1214 5th St. 
    BerkeleyCA  94702