How Much Does it Cost to Service a Sunroom in Marina Del Rey?

$14.6K Cheap
$55.9K Great Price
$112.0K Costly
View Full Cost Chart

Sunrooms in Marina Del Rey are not a project that can be considered as a DIY job, mainly because it’s linked to the present structure of the house and usually requires the employment of several types of installers like concrete pourers, electricians, and carpenters. The standard 200 square foot sunroom addition where concrete is applied, post and column build is utilized, and a four-season room or space is made will cost around $112,012. This will place the sunroom at approximately $14,560 per square foot. This will include the labor cost of carpenters at %MIN_HOURLY% per hour, electricians at around $60 to $85 per hour, and the painters will cost around $20 and $35 per hour.

Is a building permit required for a sunroom in Marina Del Rey?

The majority of jurisdictions would need some sort of permit for a sunroom. The scope of how the permit is necessary could possibly count on the category of the sunroom being built. Permit requirements are arranged at the local level, so the easiest method to identify if you require a permit is to get in touch with your city or county. They will also be able to provide the essential points concerning what is necessary to obtain the permit.

Is it possible to build my Marina Del Rey sunroom on a deck?

Yes. However, the deck needs to be improved with more supports, posts, and footings to achieve the strength needed to survive the extra weight and loads involving the brand new sunroom. Contact an area structural engineer to know if your existing deck would work. In several circumstances, it could be more cost effective to make a brand new deck, particularly if the existing deck is older or has deteriorated.

Is there a limit to the number of glass panels that can be installed in a sunroom in Marina Del Rey?

On condition that the structure is proved to be structurally sound, there are at present no restrictions on the maximum number of glass panels.

Find the Best Costs on Sunroom - Marina Del Rey, 90292

Other factors that might add to the cost of your Marina Del Rey sunroom project are the demolition, excavation and site preparation. Concrete pouring, build post and framing, installation of electricity, plumbing if necessary, windows, finishing, and insulation and installation of ceilings. If you are going to hire a building contractor, it is absolutely okay to require at least three entirely different estimates from three different groups. This approach will produce a really accurate idea of the full costs and the amount of control you will get over the project.

Local pros & Availability

Sunroom Contractors available in your area

  • Open
  • Closed
  • 1

    Solar In A Week

    Rating: 66
    8435 E Adamo Dr. 
    El SegundoCA  90245
  • 2

    Oak Park Construction

    Rating: 78
    18614 Calvert St. 
    West HollywoodCA  90069
  • 3

    Lux Builders And Remodeling Inc

    Rating: 91
    1140 Highland Ave #211. 
    Manhattan BeachCA  90266
  • 4

    Grand Crew Construction

    Rating: 73
    1227 Sweetzer. 
    West HollywoodCA  90069