How Much Does it Cost to Plaster a Pool in Prospect?

$654 Cheap
$700 Great Price
$747 Costly
View Full Cost Chart

Pool plastering Prospect cost is determined by the size of your pool, what material and finishes to be used, preparation and labor needed. Preparing a pool for plastering may require under cutting and chipping the existing tiles of a pool if there is any. Then after that, cleaning the entire pool. This preparation typically cost between $1200 and $1600 for a 16’x32’ size pool or an average size pool. The most affordable gunite pool finish is white plaster. This is commonly composed of white Portland cement and crushed marbles. It can cost around $5000 to $7000 depending on the size of the pool and if there are repairs needed before plastering.

Estimated final cost for pool plastering

Item Quantity Fair Price
Pool Labor 8.2 Hours $479.03
Pool Job Materials and Supplies 200 Square Feet $221.78
Totals - Cost to Replaster Pools - 215 Square Feet $700.81
Average Cost Per Square Foot $3.50

How long does a pool plastering Prospect take?

Typically, it will depend on the size of your pool and the preparation plus if there are repairs that have to be made before plastering. Under normal circumstance, pool plastering can take about 2 to 3 weeks to be finished.

What does start-up mean in Prospect?

Start-up is deemed to be a very crucial process needed on all newly plastered pools. New plasters tend to emit dust particles that have to be brushed and vacuumed daily. Usually, it takes 4 to 6 consecutive days. If not done, the dust will stick to the surface and will stain the plaster. The start-up also requires a proper balance of pool water chemistry. A start-up should be done by professionals.

Is there any warranty for a pool plastering Prospect service?

Yes. Pool plastering is also guaranteed by companies who do them. Residential pools normally have 10 years of warranty.

Find the Best Costs on Pool Plastering - Prospect, 06712

If you are planning to apply finishes to your pool plastering Prospect to make it even more appealing, you can choose between the two most common which are diamond brite and river roc. Diamond brite finish is made up of quartz infused colored mix. Pool plastering Prospect using diamond brite finish may cost high because of the labor and time needed plus the material. It usually cost $6000 up to $9000. Prospect pool plastering using river roc finish is the most expensive, not just in material but in labor too. Of all the pool finishes, river roc is considered to be the strongest and long lasting of all. River roc generally cost around $8000 up to $10000 depending on the size of the pool.

Local pros & Availability

Pool Contractors available in your area

  • Open
  • Closed
  • 1

    Prospect Pools LLC

    Rating: 84
    52 Waterbury Rd. 
    ProspectCT  06712
  • 2

    G Capasso & Sons

    Rating: 81
    39 Sugar Hill Rd. 
    North HavenCT  06473
  • 3

    Tanguay Pools

    Rating: 63
    40 Grandview Ct. 
    CheshireCT  06410
  • 4

    Integrity Pools Inc

    Rating: 83
    10 McKenzie Ave. 
    MeridenCT  06450
  • 5

    Solar Pool Service LLC

    Rating: 78
    473 Washington Ave. 
    North HavenCT  06473
  • 6

    Pool and Patio Works Inc.

    Rating: 78
    178 State St. 
    North HavenCT  06473