How Much Does it Cost to Build a New Home in Stone Mountain?

$12.0K Cheap
$48.9K Great Price
$99.9K Costly
View Full Cost Chart

There are two ways that Stone Mountain new home builders earn out of housing projects; the bidding method and the cost plus method. Most new home builders generally use the bidding method. With this approach, a builder will get quotations from his subcontractors or just use his judgment to arrive at a reasonable cost for the project. Typically, the price will include the plumbing, floorings, electrics, fees and much more. Afterwards, they will add their profit together with a contingency fee that is usually 10% of the overall cost. Contingency fees are included in case the project gets over budgeted. The total cost will be presented to the homeowner.

Can a reliable Stone Mountain home builder help in finding an excellent location and lot for our house?

Yes. Most new home builders can help you determine the best lot for your new house. They will take into consideration all your requirement to find a lot that will suit your needs. There are home builders who offer lots to their clients at marked up but reasonable prices.

How long will a new home building in Stone Mountain last?

Every home building is different. Therefore, they have different project durations and costs. The duration will always depend on the design of the house, the materials to be used, the location, and the size of the house.

Do Stone Mountain new home builders offer warranty for their buildings?

Yes. Most home builders offer 6 months up to 1 year of warranty from the date of turnover to ensure that all concerns of the customer will be covered for the first few months of their stay in the house.

Find the Best Costs on New Home Builders - Stone Mountain, 30083

The cost plus method is subdivided into two categories: the cost-plus-percentage and the cost-plus-fixed-rate. In a cost-plus-percentage setup, the homebuilder will get estimates for the subcontractor fees and the price of materials, appliances, furniture, and other things that will be included in the construction of the house. They will give allowance to each material that will be purchased and will mark up all of it by a set percentage. The cost-plus-fixed-rate, on the other hand, is the most preferable method. This approach allows a homeowner and new home builders to agree on a fixed rate that the builder will be paid upon. To determine the new home builder’s fee, the cost of the house, the size difficulty of the project and the location should all be taken into consideration. The builder will compute the overall total cost of the project then set a certain percentage to arrive to their fee. Always choose a trustworthy and decent new home builder. By doing so, you will be assured that your housing finances will be clean and comfortable.

Local pros & Availability

Custom Home Building Contractors available in your area

  • Open
  • Closed
  • 1

    E & C CONSTRUCTION

    Rating: 63
    4257 DURHAM CIR. 
    Stone MountainGA  30083
  • 2

    L & L CONSTRUCTION

    Rating: 58
    904 RAYS RD. 
    Stone MountainGA  30083
  • 3

    PETERSON CONSTRUCTION

    Rating: 62
    4325 BRAMWELL DR. 
    Stone MountainGA  30083
  • 4

    In-Exteriors Construction & Management

    Rating: 68
    5231 Memorial Dr.. 
    Stone MountainGA  30083
  • 5

    GRANT CONSTRUCTION

    Rating: 62
    660 JASON CT. 
    Stone MountainGA  30083
  • 6

    DMK SVC

    Rating: 61
    4024 STONEVIEW CIR. 
    Stone MountainGA  30083