How Much Does it Cost to Get Epoxy Flooring in Channahon?

$197 Cheap
$208 Great Price
$219 Costly
View Full Cost Chart

Before pushing for a new Channahon epoxy flooring project, you must know the three categories of epoxy flooring solutions to be able to estimate the cost of your project. There is 100% solid epoxy coating that is the most expensive and typically used in commercial offices. Then there is solvent-based epoxy coating and water-based epoxy coating. Water-based epoxy can cost around $30 up to $50 per gallon. Solvent-based and solid epoxy are estimated to be around $40 to $150 per gallon.

Estimated final cost for epoxy flooring

Item Quantity Fair Price
Epoxy Concrete Sealant Cost 215 Square Feet $57.23
Epoxy Concrete Sealant Labor 2 Hours $132.68
Epoxy Concrete Sealant Job Materials and Supplies 200 Square Feet $18.53
Totals - Cost to Apply Epoxy Concrete Sealer - 215 Square Feet $208.45
Average Cost Per Square Foot $1.04

How long will epoxy flooring in Channahon last?

Epoxy flooring that has undergone proper preparation and installation is guaranteed to last between 8 to 12 years. If you want to prolong its life, it is important that you clean and maintain it regularly. With proper care and maintenance, you can extend its life up to 15 years or more.

How long will it take for epoxy flooring in Channahon to be installed?

Epoxy flooring installation can last up to 3 or 4 days depending on the size of the garage area. The job usually includes the preparation and application of epoxy. Preparation usually takes time, especially if there is an existing coating on the cement that has to be removed. Visible damages like cracks have to be repaired as well. Installation or pouring of epoxy commonly includes two coatings and then the application of optional decorative chips.

How long will it take before we can walk on our Channahon epoxy floor after installation?

Light foot traffic is usually allowed after 24 hours. However, most contractors recommend at least 48 hours to ensure that the epoxy is already dried.

Find the Best Costs on Epoxy Flooring - Channahon, 60410

Hiring a professional to install your epoxy flooring in Channahon can cost around $3 to $15 per square foot or $197 to $219 for an average one-car garage that is 250 square feet in size and around $1,200 to $6,000 for an average two-car garage. Although some may opt to do the application of epoxy on their own floors to cut costs, it is still recommended to hire a professional to do the job. Professionals have years of experience when it comes to installing epoxy flooring in Channahon. One look around your garage and they may get an exact estimate of how much epoxy will be needed. This will help reduce the risk of overbuying materials for the project. A contractor can also work quickly, saving you a lot of time and effort. You will also be assured that the money paid will not go to waste because their jobs are guaranteed, and the result will be satisfying.

Local pros & Availability

Concrete Contractors available in your area

  • Open
  • Closed
  • 1

    A & H Concrete Removal

    Rating: 59
    Crest HillIL  60403
  • 2

    Stamp Concrete Gise Ov

    Rating: 63
    913 Foxvlew. 
    Crest HillIL  60403
  • 3

    J & D Concrete/Handymen Llc

    Rating: 88
    25050 W Tow Path Ln. 
    ChannahonIL  60410
  • 4

    Borracci Concrete Llc

    Rating: 92
    26300 W Winding Oak Trail. 
    ChannahonIL  60410
  • 5

    Ceco Concrete

    Rating: 80
    23420 South Frontage Rd W. 
    ChannahonIL  60410
  • 6

    Carr Concrete Construction

    Rating: 58
    26118 W Woodland Ct. 
    ChannahonIL  60410