How Much Does it Cost to Build a New Home in Topeka?

$11.0K Cheap
$44.8K Great Price
$91.5K Costly
View Full Cost Chart

There are two ways that Topeka new home builders earn out of housing projects; the bidding method and the cost plus method. Most new home builders generally use the bidding method. With this approach, a builder will get quotations from his subcontractors or just use his judgment to arrive at a reasonable cost for the project. Typically, the price will include the plumbing, floorings, electrics, fees and much more. Afterwards, they will add their profit together with a contingency fee that is usually 10% of the overall cost. Contingency fees are included in case the project gets over budgeted. The total cost will be presented to the homeowner.

Can a reliable Topeka home builder help in finding an excellent location and lot for our house?

Yes. Most new home builders can help you determine the best lot for your new house. They will take into consideration all your requirement to find a lot that will suit your needs. There are home builders who offer lots to their clients at marked up but reasonable prices.

How long will a new home building in Topeka last?

Every home building is different. Therefore, they have different project durations and costs. The duration will always depend on the design of the house, the materials to be used, the location, and the size of the house.

Do Topeka new home builders offer warranty for their buildings?

Yes. Most home builders offer 6 months up to 1 year of warranty from the date of turnover to ensure that all concerns of the customer will be covered for the first few months of their stay in the house.

Find the Best Costs on New Home Builders - Topeka, 66603

The cost plus method is subdivided into two categories: the cost-plus-percentage and the cost-plus-fixed-rate. In a cost-plus-percentage setup, the homebuilder will get estimates for the subcontractor fees and the price of materials, appliances, furniture, and other things that will be included in the construction of the house. They will give allowance to each material that will be purchased and will mark up all of it by a set percentage. The cost-plus-fixed-rate, on the other hand, is the most preferable method. This approach allows a homeowner and new home builders to agree on a fixed rate that the builder will be paid upon. To determine the new home builder’s fee, the cost of the house, the size difficulty of the project and the location should all be taken into consideration. The builder will compute the overall total cost of the project then set a certain percentage to arrive to their fee. Always choose a trustworthy and decent new home builder. By doing so, you will be assured that your housing finances will be clean and comfortable.

Local pros & Availability

Custom Home Building Contractors available in your area

  • Open
  • Closed
  • 1

    Window Design Co

    Rating: 67
    9939 NW Hwy 24. 
    Silver LakeKS  66539
  • 2

    Wooster Construction

    Rating: 77
    5200 NW 33RD ST. 
    TopekaKS  66603
  • 3

    Hack's Quality Custom Homes, Inc.

    Rating: 58
    3645 SE Paulen Rd.. 
    TopekaKS  66605
  • 4

    Elite Construction and Remodeling

    Rating: 76
    1315 SW Washburn Ave. 
    TopekaKS  66603
  • 5

    Mark Ediger Builder

    Rating: 63
    4643 SW 8th Ave. 
    TopekaKS  66606
  • 6

    Pierce Custom Homes Inc

    Rating: 72
    4720 Levering Rd. 
    TopekaKS  66603