How Much Does it Cost to Add a Room in Ada?

$11.7K Cheap
$47.9K Great Price
$97.8K Costly
View Full Cost Chart

Room additions in Ada are considered to be a major renovation and construction project since it means making an additional structure that you will connect to your house from the outside or within. The cost will greatly depend on the size of the room that you want to be added and where you will place it. It will also include the materials to be used and the labor cost. For this project, it is highly advisable to hire a builder or contractor to help you assess your options. You can have your room additions build in two different ways; either by building out for by building up.

Will I be needing a permit for my room addition project in Ada?

It depends on the scope of the project and the building policies in your city or municipality. Most cities though require permits for both building out and building up undertaking. Some may even require a zoning inspection. To avoid the hassle, consult with your contractor about the regulations. More often than not, permits are already included in your building contract with them, and they will handle it before the beginning of the construction.

Should I hire an architect and engineer for my Ada room additions?

If your room addition designs and needs require alteration of the many parts of your house, it is best to consult with your home's architect and engineer. That way, you will get a professional opinion on where you can or cannot put your addition or what kind will best fit your house's structure. It will also help to know the structural integrity of your home and if your foundations can support the added load.

Is a new Ada room addition a good investment?

Definitely. Room additions are considered to be a part of the home improvement. Houses that have gone through many home improvements tend to have a higher value in the market.

Find the Best Costs on Room Additions - Ada, 49301

Building out Ada room additions are usually added on the ground floor of a house. They’re basically used to increase traffic or to shift the traffic within the house. Building out projects usually costs more as foundations have to be poured again and significant alterations have to be made to your whole ground floor. Building up on the other side does not affect the traffic of the house. It is usually built on the higher floors of the house. This is more affordable than building out project as no new foundations will be needed. However, the builder or contractor may need to strengthen the existing foundations of your home to ensure that they can support the extra weight.

Local pros & Availability

Remodeling Contractors available in your area

  • Open
  • Closed
  • 1

    Vos Construction Co Inc Dan

    Rating: 72
    6160 East Fulton. 
    AdaMI  49301
  • 2

    Dodgson Builders Inc

    Rating: 59
    1180 Cramton Ave NE. 
    AdaMI  49301
  • 3

    Diephuis Builders

    Rating: 91
    622 Steketee Rd NE. 
    AdaMI  49301
  • 4

    Ladd E L & Co Inc

    Rating: 63
    6300 Fulton St E. 
    AdaMI  49301
  • 5

    Bruce Heys Builders Inc

    Rating: 74
    5990 Fulton St E. 
    AdaMI  49301
  • 6

    Terhorst & Rinzema Construction Co.

    Rating: 75
    5990 Fulton St E Ste A. 
    AdaMI  49301