How Much Does it Cost to Get Epoxy Flooring in Independence?

$176 Cheap
$187 Great Price
$198 Costly
View Full Cost Chart

Before pushing for a new Independence epoxy flooring project, you must know the three categories of epoxy flooring solutions to be able to estimate the cost of your project. There is 100% solid epoxy coating that is the most expensive and typically used in commercial offices. Then there is solvent-based epoxy coating and water-based epoxy coating. Water-based epoxy can cost around $30 up to $50 per gallon. Solvent-based and solid epoxy are estimated to be around $40 to $150 per gallon.

Estimated final cost for epoxy flooring

Item Quantity Fair Price
Epoxy Concrete Sealant Cost 215 Square Feet $55.74
Epoxy Concrete Sealant Labor 2 Hours $113.46
Epoxy Concrete Sealant Job Materials and Supplies 200 Square Feet $18.05
Totals - Cost to Apply Epoxy Concrete Sealer - 215 Square Feet $187.24
Average Cost Per Square Foot $0.94

How long will epoxy flooring in Independence last?

Epoxy flooring that has undergone proper preparation and installation is guaranteed to last between 8 to 12 years. If you want to prolong its life, it is important that you clean and maintain it regularly. With proper care and maintenance, you can extend its life up to 15 years or more.

How long will it take for epoxy flooring in Independence to be installed?

Epoxy flooring installation can last up to 3 or 4 days depending on the size of the garage area. The job usually includes the preparation and application of epoxy. Preparation usually takes time, especially if there is an existing coating on the cement that has to be removed. Visible damages like cracks have to be repaired as well. Installation or pouring of epoxy commonly includes two coatings and then the application of optional decorative chips.

How long will it take before we can walk on our Independence epoxy floor after installation?

Light foot traffic is usually allowed after 24 hours. However, most contractors recommend at least 48 hours to ensure that the epoxy is already dried.

Find the Best Costs on Epoxy Flooring - Independence, 64050

Hiring a professional to install your epoxy flooring in Independence can cost around $3 to $15 per square foot or $176 to $198 for an average one-car garage that is 250 square feet in size and around $1,200 to $6,000 for an average two-car garage. Although some may opt to do the application of epoxy on their own floors to cut costs, it is still recommended to hire a professional to do the job. Professionals have years of experience when it comes to installing epoxy flooring in Independence. One look around your garage and they may get an exact estimate of how much epoxy will be needed. This will help reduce the risk of overbuying materials for the project. A contractor can also work quickly, saving you a lot of time and effort. You will also be assured that the money paid will not go to waste because their jobs are guaranteed, and the result will be satisfying.

Local pros & Availability

Concrete Contractors available in your area

  • Open
  • Closed
  • 1

    Bachtel Concrete

    Rating: 58
    IndependenceMO  64050
  • 2

    A1 Residential Concrete

    Rating: 59
    611 N Sunset Dr. 
    IndependenceMO  64050
  • 3

    Barbour Concrete Co

    Rating: 75
    21421 E Truman Rd. 
    IndependenceMO  64050
  • 4

    On The Rise Concrete Service

    Rating: 63
    4909 Whitney Dr. 
    IndependenceMO  64055
  • 5

    Virgil Rose Concrete & Asphalt

    Rating: 63
    4104 S River Blvd. 
    IndependenceMO  64055
  • 6

    Chavez R Concrete Construction

    Rating: 59
    11407 E Truman Rd. 
    IndependenceMO  64050