How Much Does it Cost to Build a New Home in Trinity?

$10.3K Cheap
$41.9K Great Price
$85.6K Costly
View Full Cost Chart

There are two ways that Trinity new home builders earn out of housing projects; the bidding method and the cost plus method. Most new home builders generally use the bidding method. With this approach, a builder will get quotations from his subcontractors or just use his judgment to arrive at a reasonable cost for the project. Typically, the price will include the plumbing, floorings, electrics, fees and much more. Afterwards, they will add their profit together with a contingency fee that is usually 10% of the overall cost. Contingency fees are included in case the project gets over budgeted. The total cost will be presented to the homeowner.

Can a reliable Trinity home builder help in finding an excellent location and lot for our house?

Yes. Most new home builders can help you determine the best lot for your new house. They will take into consideration all your requirement to find a lot that will suit your needs. There are home builders who offer lots to their clients at marked up but reasonable prices.

How long will a new home building in Trinity last?

Every home building is different. Therefore, they have different project durations and costs. The duration will always depend on the design of the house, the materials to be used, the location, and the size of the house.

Do Trinity new home builders offer warranty for their buildings?

Yes. Most home builders offer 6 months up to 1 year of warranty from the date of turnover to ensure that all concerns of the customer will be covered for the first few months of their stay in the house.

Find the Best Costs on New Home Builders - Trinity, 27370

The cost plus method is subdivided into two categories: the cost-plus-percentage and the cost-plus-fixed-rate. In a cost-plus-percentage setup, the homebuilder will get estimates for the subcontractor fees and the price of materials, appliances, furniture, and other things that will be included in the construction of the house. They will give allowance to each material that will be purchased and will mark up all of it by a set percentage. The cost-plus-fixed-rate, on the other hand, is the most preferable method. This approach allows a homeowner and new home builders to agree on a fixed rate that the builder will be paid upon. To determine the new home builder’s fee, the cost of the house, the size difficulty of the project and the location should all be taken into consideration. The builder will compute the overall total cost of the project then set a certain percentage to arrive to their fee. Always choose a trustworthy and decent new home builder. By doing so, you will be assured that your housing finances will be clean and comfortable.

Local pros & Availability

Custom Home Building Contractors available in your area

  • Open
  • Closed
  • 1

    Kennedy Custom Homes

    Rating: 58
    1940 Tabernacle Church Rd. 
    TrinityNC  27370
  • 2

    KIMBALL HOME INC

    Rating: 63
    233 S MAIN ST. 
    High PointNC  27260
  • 3

    Roddenberry Myron Gadson

    Rating: 74
    1752 Yokley Rd. 
    TrinityNC  27370
  • 4

    Timberline Services

    Rating: 73
    Brandon R Murphy, T A. 
    TrinityNC  27370
  • 5

    Griffin Home Improvements and Additions

    Rating: 69
    P.O. BOX 551. 
    TrinityNC  27370
  • 6

    A.M.E. Builders

    Rating: 74
    1492 London Dr.. 
    High PointNC  27260