How Much Does it Cost to Install Hardwood Flooring in Henrietta?

$10.1K Cheap
$11.3K Great Price
$12.5K Costly
View Full Cost Chart

Hardwood flooring installation in Henrietta costs around $10,080 on average. It may not sound like an affordable feat but given all the benefits that it can provide to you, your family and your home, it is an investment that will surely pay off in the long run. There are two things to consider in estimating the cost of hardwood flooring installation. First is the cost of material per square foot and second, the cost of installation per square foot. Hardwood flooring is categorized into two types: traditional and engineered. Traditional wood costs around $3 up to $14 per square foot, starting from low-class wood like soft pine to high-class wood like Brazilian walnut. Engineered wood can cost around $3 up to $13 per square foot. The range covers low class up to the high class of engineered wood.

Estimated final cost for hardwood flooring installation

Item Quantity Fair Price
Hardwood Flooring Cost 1282 Square Feet $6,344.27
Hardwood Flooring Labor 66.8 Hours $4,355.88
Hardwood Flooring Job Materials and Supplies 1200 Square Feet $536.71
Hardwood Flooring Equipment Allowance $48.69
Totals - Cost to Install Hardwood Floors - 1282 Square Feet $11,285.55
Average Cost Per Square Foot $9.40

Is there anything that I need to do in Henrietta to prepare for the installation?

You have to move household furniture and devices from spaces in which the floor shall be placed and locate some room for your brand-new flooring to get acclimated before installation. Based on the type of finish being used on your floors, the service providers may demand to shut off the home appliances and pilot lights just before they initiate work.

Exactly how long would it take for the finishing and installation of hardwood in Henrietta to be done?

Because hardwood floorings are an all-natural type, it is necessary that the floor you decide on has to be stored in the area of your home where it is going to be installed for pre-acclimation. This procedure will require somewhere around one week or right until the correct moisture reading is taken. The installation itself will require 1 to 2 days based on the extent of the job. The moment the floors are installed, the floor has to post-acclimate for about a couple of weeks just before sanding. This allows the floor to build up without inducing any cupping problems on the floor. When the maximum acclimation is finished, the floors are now prepared to be sanded and finished. The finishing procedure will take approximately four to five days.

How many hours do I have to wait before using my floors?

We highly recommend patiently waiting for 6 hours before walking onto your brand-new floors. After 24 hours you may walk through with your shoes on. Allow about 48 hours before placing furniture. Carpets can only be placed after 1 week.

Find the Best Costs on Hardwood Flooring Installation - Henrietta, 14467

The amount of money you pay for Henrietta hardwood flooring installation depends on some variables, among them are where you reside along with the difficulty of your undertaking. For instance, household furniture removal and replacement, mending the subfloor and getting rid of the old floor all boost the overall cost of the project. For example, several installers ask for $.20 per square foot for tearing up and removing rugs or relocating furniture. Some may demand a per-appliance fee for moving home appliances.

Local pros & Availability

Flooring Contractors available in your area

  • Open
  • Closed
  • 1

    Santillos Hardwood Floor Resurfacing

    Rating: 57
    92 1/2 Summit St. 
    FairportNY  14450
  • 2

    Ruggeri & Walsh Construction Inc.

    Rating: 61
    7 White Oak Lane. 
    FairportNY  14450
  • 3

    Flower City Flooring Incorporated

    Rating: 62
    557 Whitney Rd W. 
    FairportNY  14450
  • 4

    J.A. Stanwix General Contractor

    Rating: 70
    P.O. Box 706. 
    FairportNY  14450
  • 5

    PERINTON CARPET & FLOORING ROCHESTER NY

    Rating: 72
    7374 Pittsford Palmyra Rd. 
    PerintonNY  14450
  • 6

    FEDELE CONSTRUCTION

    Rating: 59
    127 EAST AVE. 
    East RochesterNY  14445