Costs will, of course, be the next thing on your mind, having looked into the design that you want. It is also one of the reasons why you should consult professional stainless steel countertops Grove City contractors to assist you. The materials and installation costs will be at the top of the worksheet. In most cases, these are measured per square foot of installation required. Have a professional contractor walk through the design you want with you, then together you will work out the necessary information on how to make this work.
Estimated final cost for stainless steel countertops
Item | Quantity | Fair Price |
---|---|---|
Metal Countertop Cost | 215 Square Feet | $11,222.58 |
Metal Countertop Labor | 15.9 Hours | $748.54 |
Metal Countertop Job Materials and Supplies | 200 Square Feet | $476.80 |
Totals - Cost to Install Metal Countertops - 215 Square Feet | $12,447.92 | |
Average Cost Per Square Foot | $62.24 |