How Much Does it Cost to Build a New Home in Kirkland?

$14.6K Cheap
$59.5K Great Price
$121.5K Costly
View Full Cost Chart

There are two ways that Kirkland new home builders earn out of housing projects; the bidding method and the cost plus method. Most new home builders generally use the bidding method. With this approach, a builder will get quotations from his subcontractors or just use his judgment to arrive at a reasonable cost for the project. Typically, the price will include the plumbing, floorings, electrics, fees and much more. Afterwards, they will add their profit together with a contingency fee that is usually 10% of the overall cost. Contingency fees are included in case the project gets over budgeted. The total cost will be presented to the homeowner.

Can a reliable Kirkland home builder help in finding an excellent location and lot for our house?

Yes. Most new home builders can help you determine the best lot for your new house. They will take into consideration all your requirement to find a lot that will suit your needs. There are home builders who offer lots to their clients at marked up but reasonable prices.

How long will a new home building in Kirkland last?

Every home building is different. Therefore, they have different project durations and costs. The duration will always depend on the design of the house, the materials to be used, the location, and the size of the house.

Do Kirkland new home builders offer warranty for their buildings?

Yes. Most home builders offer 6 months up to 1 year of warranty from the date of turnover to ensure that all concerns of the customer will be covered for the first few months of their stay in the house.

Find the Best Costs on New Home Builders - Kirkland, 98033

The cost plus method is subdivided into two categories: the cost-plus-percentage and the cost-plus-fixed-rate. In a cost-plus-percentage setup, the homebuilder will get estimates for the subcontractor fees and the price of materials, appliances, furniture, and other things that will be included in the construction of the house. They will give allowance to each material that will be purchased and will mark up all of it by a set percentage. The cost-plus-fixed-rate, on the other hand, is the most preferable method. This approach allows a homeowner and new home builders to agree on a fixed rate that the builder will be paid upon. To determine the new home builder’s fee, the cost of the house, the size difficulty of the project and the location should all be taken into consideration. The builder will compute the overall total cost of the project then set a certain percentage to arrive to their fee. Always choose a trustworthy and decent new home builder. By doing so, you will be assured that your housing finances will be clean and comfortable.

Local pros & Availability

Custom Home Building Contractors available in your area

  • Open
  • Closed
  • 1

    UBuildIt Corporation

    Rating: 79
    12006 98th Ave NE Suite 200. 
    KirklandWA  98034
  • 2

    C.D. Watkins Construction

    Rating: 75
    12825 N.E. 142 PL. 
    KirklandWA  98034
  • 3

    Hamish Anderson Custom Homes

    Rating: 79
    10829 NE 68th St #201. 
    KirklandWA  98033
  • 4

    Sound Cabinet and Constructioin

    Rating: 70
    218 Main St, Suite 449. 
    KirklandWA  98033
  • 5

    Diamond Custom Homes Inc

    Rating: 74
    14615 112th Ave NE. 
    KirklandWA  98034
  • 6

    Lux Custom Homes

    Rating: 92
    11705 Ne 106th Ln. 
    KirklandWA  98033